|
|
EQUIPMENT, RIGGING & MILLWRIGHTEquipment Installation, Millwright Work and Alignment ServicesNo matter the size, weight, configuration or sensitivity of your system, we can handle your job professionally and accurately. With state of the art laser and optical alignment tools ensuring accuracy, Atlantic Constructors can install and precisely align:
![]() Heavy Rigging and TransportAtlantic Constructors is a leader in the arena of heavy lifting and rigging. We custom design systems that can move and install heavy and sensitive equipment precisely and on time. We offer assistance with feasibility studies and budget evaluations as well as the hands on work involving:
![]() Philip MorrisPhilip Morris is our largest industrial client, and we have been working together for more than 20 years, both in Virginia and North Carolina. We have experience with all aspects of their facilities, from production and manufacturing to the administrative areas and central mechanical plants. We have performed many functions and tasks to include:
Atlantic Constructors maintains a full-time staff of technicians, general tradesmen, HVAC/plumbing installers, millwrights, and ironworkers which service all of Philip Morris' facilities. We have performed on countless projects such as the installation of the following:
![]() BI Chemicals S5 Production Facility, Petersburg, VAIn addition to the process piping, steel erection and HVAC scopes, Atlantic Constructors performed rigging and equipment setting of the following for BI Chemicals new 55,000 sq. ft. multi-story, pharmaceutical production facility:
![]() United Parcel Service (UPS) Regional Hub Distribution Facility - Richmond, VAWe have installed and maintained a large percentage of the package conveyor and material handling systems at the Regional Hub Distribution Facility for UPS.![]() Service Center Metals - Prince George, VAAtlantic Constructors has installed and maintained various pieces of production equipment in this 78,000 sq. ft. aluminum extrusion plant. Some examples of these pieces include:
![]() DuPont Teijin Films - Enon, VAAtlantic Constructors has installed and maintained dryers and set and aligned casting drums in this polyester film manufacturing plant.![]() Virginia Polymer - Richmond, VAWe have recently off-loaded and set two 27,000 lb. dryers. |
||||